y we need to take 28 days strength as compressive
strength ? y cant we take 30 th day
Answer Posted / ravi
In 28 days, concrete will gain its complete strength. After 28 days, you can take the strength on any day. You will get the same result. We need the results as early as possible. 28 days the minimum time it takes for the concrete to gain its complete strength. So, we take 28 day strength.
| Is This Answer Correct ? | 44 Yes | 3 No |
Post New Answer View All Answers
types of survey and levelling instrument ?
What are the different softwares used for cad?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
What is made from large rocks, which protects the base of cliffs?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
Draw the cross section of a boundary wall and label its part with detailing?
what is meant by shear center?????
what motivates you to do a good job
How to calculate carrying capacity of the existing water supply trunkmain
in 100 cft = 1350 bricks in 100 cft = ? bloks
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
what are the duties of Site Engineer in work site?