y we need to take 28 days strength as compressive
strength ? y cant we take 30 th day
Answer Posted / ravi
In 28 days, concrete will gain its complete strength. After 28 days, you can take the strength on any day. You will get the same result. We need the results as early as possible. 28 days the minimum time it takes for the concrete to gain its complete strength. So, we take 28 day strength.
| Is This Answer Correct ? | 44 Yes | 3 No |
Post New Answer View All Answers
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
what is the basic difference between Coloumn & Shear Wall
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
115mm thickness brick work how to required mortar
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
How do you maintain water pressure?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
How to increase a bearing capacity of soil?
Define What is the meaning of a blue land surveyors flag?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
how to compute slab reinforcements on step by step procedures??