Answer Posted / selva ganapathi
In terms of testing, gap analysis is to identify whether
all the base lined requirements defined by the business
analyst and implicit requirements of the defined
requirements are covered in the design. If any thing found
missed in the design document, defect/s or concern can be
raised against the design team.
This could be called as Pre-QA defects.
Gap analysis is a way to identify the static defects.
Benefits:
Static defects require less cost or even no cost to fix
rather than the dynamic defects.
Minimizes the design change for the defects raised during
the test execution
Possibility of missing a requirment would be minimal
Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
IF i have two columns in Database , While using Database output value ,allthe values in the two column are set as a single row in the QTP datatable, can u suggest me a idea so that QTP Runtime datatable displays the values as it is in the database
What is coverage analysis?
Explain metric?
What is Functional, Non-Functional, and Regression used for (i.e. the purpose of each)?
When is rtm (requirement traceability matrix) prepared?
What is metric?
Explain usability testing?
What is positive testing?
What is a user interface?
What is system simulation?
What is stochastic testing?
What does cots represent?
The purpose of the requirement phase is
please anyone can help me in giving dumps in ISTQB for foundation level
Hi do any one has dumps for ISTQB or ISEB exams for august or september exam 2013. Pleae mail qazwsx2631981@yahoo.co.in