If sechuduled backup through db13, but it is not triggered?
Answer Posted / r
Programs scheduled via DB13 can be executed on different
background servers (source hosts) depending on the system
status and the current load distribution. Under certain
circumstances, server-dependent analyses (such as the
parameter value for SAPDBHOST or privileges for RSH
connections) must therefore be carried out on every possible
source host. For more information, see Notes 10403 and
118057 also.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
In a situation where my sap system is down (users unable to login to sap system), how to analyze the problem?
Differentiate between synchronous and asynchronous transport
describe where they would look at the buffer statistics, and what steps they would use to adjust them?
I have solman 7.1 Stack3. I want to upgrade to stack13. My question is can I directly download stack13 files from marketplace, if yes, will those files includes xml file ? (MOPZ is not configured in my system).
How can I restrict the user from printing?
If you have a long-running Job, how do you analyse?
What is JVM switch. Why JVM switch is required ?
How to find users used transaction codes which are not authorized for?
describe how to setup a printer in SAP or where they would look to research why a user/users can not print?
What will happen during the export process?
Where do you check transport request logs?
What is the purpose of webdisptcher and Installing and configuring Web Dispatcher what are the prerequisites?
Is it possible to install sap patches when other users are online?
Explain what is the importance of table t000?
can we give one check for all vendors in automatic payment run? how?