Answer Posted / micro
The question is actually not so specific. Two possible
thought it meant.
1. If you meant the volume of powder cement to fill 1mmm
then the answere is from 29 to 30 bags.
2. If you meant no of bags to use for a mix to form a 1mmm
concrete, then the answer is nearly 8 bags. The
rest of the volume is for san and gravel.
Maybe it helps. thanks.
Micro
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is thumb rule in quality and quantity estimation of a Residential building??
what is that one cub metre plaster in cemant and fine sand
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
What is the difference between Fe 500, Fe 500 D and Fe 515.
what is the design procedure for building
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
What is the difference between 53 grade and 43 grade cement
What is meant by a context menu in a cad software?
how much repeitation for conventional and maivan formwork?
How much cement,sand,bricks and water needed for 1square metre brick work?
What are the alternate material for steel, Sand and aggregate
What is quantity of cement and sand required for 2000sqft of tiling?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
Explain what is 1/8 on the architect ruler denotes?