What is meant by inverse definite mean time (IDMT)&
definitemean time (DMT)?

Answer Posted / k.prakashchandra

The definite mean time lag in disc type EM relays is inverse
to current as the disc is faster at higher current and hence
the less time.Definite mean time lag is possible in static
relays by setting the time lag.

Is This Answer Correct ?    4 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the different types of dams?

755


While performing stability test of differintial cts how to know the voltage and current on both side of the transformer?

3181


what is the formula for efficiency of francis turbine and generator for hydropower? what is best way to select francis turbine and generator?

2099


how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.

1846


1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?

1686






What is the difference between earthing,ground&nutral?

5638


What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?

1985


How to know the following data of synchronous generator 1. D-Axis Unsaturated Reactance 2. D-Axis Unsaturated Transient Reactance 3. D-Axis Unsaturated Sub - Transient Reactance

1571


why star point of HT motor not earthed?

1844


what are the precuation should be taken ahen installing power transformer,circuit breaker,current & potential transformer

1705


What are the functions of temperature scanner in power transformer?

1715


What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side

1074


Why you want to join non technical field when you are an engineer?

6321


Explain about retrofitting of machine tool.

1560


The screw thread commonly used for transmission of motion is one of the following types of threads

790