Answer Posted / m ghailani
15000 ltr.= 15 m3 (1 m3 =1000 ltr.)
For tank height = 1m +0.1m (free board)=1.1m
Area needed = 15m3/ 1m= 15m2
For tank height = 2m +0.1m (free board)=2.1m
Area needed = 15m3/ 2m= 7.5m2
similarly we can find the area for any depth.
note:Free board is the space to be left above water
(between water surface and tank cover), it is usually taken
as 10cm (0.1m).
Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
Pls explain me about tension and compression in a flat slab
Spider cracks occur in beam bottom due to––
What materials were used to build the golden gate bridge?
HOw much % of premium on DSR-2013 currently
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
in plate load test what is the thickness of plate 20mm 5mm 50mm none
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
construction workers how much time take one work or qty
what's the formula for calculate pcc for matt(45mm aggregate)?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Sir how to find cutting length for footing steel bars in the shape of "u"
What is thumb rule in quantity and cost estimation of a residential building?
trapozidal