Answer Posted / m. ghailani
The detention time of oxidation pond is equal to influent
discharge divided by the volume of pond.
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
How to build the floor to ceiling bookcase?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
what r you reqired for concrete baching plant?
In reclamation works what are the importance of geotextiles and sand?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What are the different methods for drawing an arc?
What is meant by cad?
Which stone is best for wall construction Laterite Stone or Cement Blocks
what is raft foundation
How do you compute the volume of airflow?
What is portland cement
Concrete cover for slab, column, beam and footing?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Explain different types of rcc pipes.
Technical Question of Civil Engineering