Answer Posted / m. ghailani
The detention time of oxidation pond is equal to influent
discharge divided by the volume of pond.
Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
How many types of slabs are there & how to design it?
List out some of the checking’s, done at the completion of construction?
how much used soil in 1 brick of standard size?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
What is limit state method and working stress method and ultimate method
how many litres of enamel paint required for 5000 sft of site??
What Are The Different Type Of Slump Test Indications?
a butt weld is specified by
How will you Engage Labours on Site?
What are the phases inspections are done by local authority while construction?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Where is the worlds longest elevator and how long is it?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
afe or not
What is Heavy Concrete & Normal Concrete