how to calculate the steel for rcc slab?
plz tell me the formula for calculating the steel?
Answer Posted / k.k. gupta
Total iron required is 115 Kg per 100 squire feet.
| Is This Answer Correct ? | 55 Yes | 36 No |
Post New Answer View All Answers
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What is the Null Point of chimney in Power Plant
Coverage of 25mm.thick ratio of 1:4 cement mortar?
Concrete cover for slab, column, beam and footing?
What is bylayer?
For fine aggregate which is most suitable River sand or crusher sand & why ?
How to calculate the quantity of ingredients of M20 grade concrete?