Answer Posted / vikram syal
its depends upon how much big work of construction.
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
150mm bricks size how many use 4.14 m3
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
What is unit weight of normal concrete?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
what is castigliano theaorem
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
How do you compute volume of airflow?
What is the use of extruded feature in solidsworks?
how statics is different from dynamics
how do you stabilize a waterlogged area in road construction
In which code the the maximum height of concrete casting has been explained
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....