WHAT IS TEAM SIZE IN CONSTRUCTION WORK

Answer Posted / vikram syal

its depends upon how much big work of construction.

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3335


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

1648


150mm bricks size how many use 4.14 m3

1413


03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1

1730


What is unit weight of normal concrete?

682






If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

1914


I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.

1677


what is castigliano theaorem

1835


How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument

1739


How do you compute volume of airflow?

693


What is the use of extruded feature in solidsworks?

779


how statics is different from dynamics

1247


how do you stabilize a waterlogged area in road construction

6316


In which code the the maximum height of concrete casting has been explained

2338


Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

1939