Answer Posted / muhammad ali
Datum line or point is a reference point for level
measurement.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Can anybody tell me which type of question are asked in the interview for the FORMULATION(Pharma) as a instrumentation engineer, & question in building managment system.
State bernoulli’s application.
Hi, I am Newely Joined in Construction company instrument engineer? Any one can Plz tell me How can I advanced preparation for Releated Engineering and construction Documents?
How d.p. Transmitter can be applied to close tank?
Explain bernoulli’s theorem.
what is the difference between Cv and air consumption? why the customer needs Air consumption details?
State some of balance principle’ advantages?
What happen if I install my pressure transmitter below the elevation of pipe in natural gas service?
what is the procedure for auto tune in masoneialn 12300 series displacer type transmitter?
i am from instrument branch i want paper patern of mahagenco . any pevious years paper regarding my branch send me please . please.....
what is installation and commissioning of (fat & sat) of power plant dcs ? this question keeps in desirable conditions of one company .
Please can anybody help for control valve sizing step by step procedure?
how to convert cubic metre per hour to newton cubic metre per hour
Explain about safety integrated level protection? . How it was differ from other protections ?
WHY THE DEGREE OF VALVE PLUG AND VALVE SEAT IS SLIGTLY DIFFERENT I CONTROL VALVE TRIM DESIGN