Three boxes 1,2,3 contain values 3,17,34. Get 40 in box 1
in 3 steps.
Answer Posted / yamuna
I couldn't understand vasim's answer please explain it.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
a grandfather has 5 sons and daughters and grandchildren.they have to be arranged in a row such that the first 4 seats and last four seats are to be taken by grandchildren and the grandfather would not sit adjacent to any of the grandchildren.
---- of a mutual instrument vibrate 6,8 & 12 intervals respectively. If all three vibrate together what is the time interval before all vibrate together again?
A work is done by the people in 24 min. one of them can do this work a lonely in 40 min. how much time required to do the same work for the second person.
In an examination 30% of the students failed in Maths, 40% failed in Science and 25% failed in both the subjects. If 220 passed in both the subjects. Find the number of students appeared in the examination ?
Mr. Jaweri decided to walk down the escalator on the station. He found that if he walks down 26 steps, he requires 30 seconds to reach the bottom. However, if he steps down 34 stairs he would only require 18 seconds to get to the bottom. If the time is measured from the moment the top step begins to descend to the time he steps off the last step at the bottom, find out the height of the stair way in steps?
A company installed 36 punching machines at the begining of the year.In the spring they installed 9 additional m/c's and then discontinued 18 in the fall.How many were still installed at the end of the year?
if x=y=2z and xyz =256 then x=
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
If it takes 10 technicians working 6 hours to build a server. They start woring at 11 AM and 1 technician is added per hour starting at 5 PM. At what time they will finish the server?
15 software functions are there. It is known that atleast 5 of the m are defective. What is the probability that if three functions are chosen and tested, no errors are uncovered.
A hotel has 10 storeys. Which floor is above the floor below the floor, below the floor above the floor, below the floor above the fifth.
Why do we buy you?
How do you convince the retailer to sell you product?
if a man reduces the selling price of a fan from 400 to 380 his loss increases by 20% .cost price of fan is.
How many 3-digit numbers with atleast one 5 in their digits?