Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is The meaning Of Auto cad And Also Define What Is
Drawing According To You

Answer Posted / pankaj mehta

ACC. to me autocad is a software sold by autodesk compny and
the autodesk founder was john walker release in 1982.its a
computer software which can be run in personal computer to
draw the 2d and 3d drawing with the help mouse

Is This Answer Correct ?    20 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the development length given in pile?

3023


what is the price of a cubic meter of concrete on international market?

1208


Explain what is the release of lien?

1221


what is the use of beam end forces while using a staad ? wha they are show

2965


what is parametre for M25 after 7 days strength

1995


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2555


for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)

2171


I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1986


What are the RISKS during the project construction?

2282


What is the diff between cad & cadd?

1177


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2084


what is flashing?

1158


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

3016


que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?

2493


what are the changes in concrete pour height as per IS 456, 2009?

3134