i/p o/p1 o/p2
1 1 4
1 1 5
1 1 6
2 2
2 2
2 2
3
3
4
5
6
how to populates i/p rows into o/p1&o/p2 using datastage
stages?and also the same scenario using sql?
Answer Posted / srinivas
first sort the data,
then
take two stage variable
if (sv1=sv2) then ds.link1 else ds.link2
| Is This Answer Correct ? | 1 Yes | 13 No |
Post New Answer View All Answers
What are the benefits of datastage?
State the difference between an operational datastage and a data warehouse?
how can we create rank using datastage?what is the meaning of rank?
What is the use of datastage director?
What a datastage macro?
describe the Steps to confiure a Qlogic switch
What is the roundrobin collector?
Describe stream connector?
how to connect source to db?generally what r stages u used? how to find the data is having delimiter format?
How many Key we can define in remove duplicate stage?
what is the difference between == and eq in UNIX shell scripting?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
what are .ctl(control files) files ? how the dataset stage have better performance by this files?
What are the difference types of stages?
Hi everyone,I have kept a project Sales And Distribution for a pharmaceutical company.can anybody explain one complex business rule that we had in our project and how did you accomplish it using DS?