Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How can we calibrate the level interface for Fisher®
FIELDVUE® DLC3000?if use water to calibrate and our liquid
SG are 0.75 and 1 ,Displacer height=14" and How much should
be set SG in trasmitter during calibrate,for URV and LRV
how shold be set

Answer Posted / iit

Calculation # If the calibrating liquid is water:
In the DLC3000 (Need Hart to communicate)
-ON Basic set up_PV set up set PV is Level
-ON Basic set up_PV set up set Specific Gravity =1
-ON Basic set up_PV set up_PV Rang set URV=14"and LRV=0".

1. First close both the primary isolation valves and drain
the liquid inside the chamber.
2. Fill water up to the center of lower flange level =0"
=0%
2.1 At DLC3000 on Basi set up_Sensor calibrate_Two Liquid
Lvl cal select Lower cal to get 0" =0% output
3. Fill it up to the center of the top flange level =14"
=100%
3.1 At DLC3000 on Basi set up_Sensor calibrate_Two Liquid
Lvl Cal select Upper cal to get 14" =100% output.
4. Fill it up to 50 %, check linearity.

After calibration completed with water and back on service
for interface
On DLC3000
-ON Basic set up_PV set up set PV is Interface
-ON Basic set up_PV set up set upper SG is 0.75,Lower SH=1.0
-ON Basic set up_PV set up_PV Rang set URV=14"and LRV=0".
and close drain valve and open both the primary isolation
valves unit ready to in service

Is This Answer Correct ?    8 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i hav applied for the post of engg. in iocl so please require the past test papers fro instrumentation engg please please help me and send me the papers or tell me the pattern and type of ques asked in examination......

2049


HI, can anybody give details about GAS TREATMENT PLANT CONSTRUCTION,as INSTRUMENTATION ENGINEER what are the responsibilites.what are the instruments mainly instrumentation engineer will deal with

2091


How u measure the massflow in orifice flow measurement techniques

1407


how we are selecting instuments by differentiating certain instruments in 4 to 20 ma range and certain in 1 to 5 v dc

2079


Hi i m B.E. In elect. & comm. I m workin in bio mass plant from 6 mnths as inst. Engg. but now i m in dept. Of operation as shift engg...which is best operation or inst. 4 me? M confusd..plz help and reply me..

4246


Explain the working of an electronic level troll.

1094


Sir , i have completed my M.Sc In Instrumentation and presently working in Maintenance department 3 yrs Exp , is there is any possible for work in offshore ..

1836


what step is taken for ESD ( emergency shut down) in DCS REPLY to hashimka20009@gmail.com

2323


how to calibrate corollaries (Mass flow meter)?

2168


in which principle pressure tx,level tx ,flow tx,temp tx ,control valve works?

3176


Why all the drains(Gland sealing,ESV,Casing inlet etc) are directly connected to the flash tank instead of hotwell of the condensor in the power plant? My Email Id:naba02222@gmail.com

2287


WHAT IS MEANT BY PROJECT MANAGEMENT STRATEGIES IN INSTRUMENTATION?

3543


WHAT ARE THE INSTRUMENTAL DIAGRAMSOF VALVES?

2128


I want to know about DDCMIS in detail ? please explain it. Also give name of reference books in which it is explained in detail in very simple manner.

3830


What is PDS and PDMS ?

2159