infosys campus ques...
u drive a car,nmb of d car is KA17M8719. it leaves at10:26am
frm davanager to bangalor which is264km away at a speed of
95km/hrCar reachs bangalor at 4:18pm. nw tel me wat is d
date of birth of drvr
Answer Posted / pappu
since iam the driver i
know my DOB.
| Is This Answer Correct ? | 77 Yes | 4 No |
Post New Answer View All Answers
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
it is a corrected question." make a list of engineering property(properties) of soil.
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
Explain what is the difference between built area and super built up area?
"Gates of the dams are generally designed of curved shape". Why?
I am called for interview from north east power plant .so, I need some interview question which may help me.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the mix design for M:60 with micro silica andmetakaoline?
What is the strength of cement?
What is thumb rule in quality and quantity estimation of a Residential building??
How can you achieve soil enforcement?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
What is need for setting limits?
can you provide a link for manual design of building?
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants