The IT giant Tirnop has recently crossed a head count of
150000 and earnings of $7 billion. As one of the forerunners
in the technology front, Tirnop continues to lead the way in
products and services in India. At Tirnop, all programmers
are equal in every respect. They receive identical salaries
ans also write code at the same rate.Suppose 12 such
programmers take 12 minutes to write 12 lines of code in
total. How many lines of code can be written by 72
programmers in 72 minutes?
Answer Posted / somasundarraj
12 such programmers take 12 minutes to write 12 lines of code
means
1 programmer take 12 minutes to write 1line
72 programmer take 12 minutes to write 72line in total
72 programmer take 72 minutes to write 432(72*6)line in total
because the time increased into 6 factor(72/6)
| Is This Answer Correct ? | 29 Yes | 9 No |
Post New Answer View All Answers
In the given figure, PA and PB are tangents to the circle at A and B respectively and the chord BC is parallel to tangent PA. If AC = 6 cm, and length of the tangent AP is 9 cm, then what is the length of the chord BC?
Find the next number in the series 12,21,,112,121,122---
One skirt requires 3.75 yards of cloth. How many skirts you can make from 45 yards?
An equilateral triangle of sides 3 inch each is given. How many equilateral triangles of side 1 inch can be formed from it?
There are no of urns &no of balls. If three balls are placed in each urn then 3 balls is left. If 4 balls are placed in each urn then 1 urn is left. What is the total no of balls?
A boy multiplied a number with 10 and got 100,instead of dividing it . If he divided it what would be the answer?
if 2 miles of fence enclose a square plot of 160 acres,how large a square will 4 miles of fence
Find the next series: AA AB BC CE ?
At six o'clock the wall clock struck 6 times . Checking with my watch , I noticed that the time between the first & last strokes was 30 seconds . How long will the clock take to stike 12 at mid night
A person sold two articles for 80 /- each.with 20% profit on one article and 20% loss on another article, what is the loss / profit he will gain on both.
Current/most recent employer (Please state full names and address including Country and post code) Current Position Held When would you be available to start work? ONLINE INTERVIEW [INSTRUCTIONS: Give brief answers to all the under listed questions] QUESTIONS ANSWER SPACE 1) What are your years of experience? 2) How do you approach a technical problem? Give an example. How long do you think it would be before you will make a significant contribution to the team/company?
A works thrice as much as B. If A takes 60 days less than B to do a work then find the number of days it would take to complete the work if both work together?
A sales person multiplied a number and get the answer is 3, instead of that number divided by 3. what is th answer he actually has to get ?
Three men A, B, C can complete a work separately in some specified days (May be 8, 7, 6).If they do the work together by alternate days. Then how many days need to complete the work?
SEND + MORE = MONEY. Then what is the value of M + O + N + E + Y ?