Answer Posted / sajid
you are very correct..but u forgot one main thing..the scan
for PLC is lessthan DCS..
scan time for PLC is 100ms and scan time for DCS is 500 ms..
so that in indusrties they are using the PLC's for critical
operations along with DCS..such as shutdown or emergency
operations..
Regards..
SAJID
INSTRUMENTATION ENGINEER
| Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
what is the process to make control schematic ?
how to tune siemens sipart electro pneumatic positioner..plz tel me..
Where is wet leg is used?
how to measure oxygen which methods are using?
what is the electrical operation procedure for switching on 27.6MVA electric furnace.
Which type of pressure can be measured by primary elements?
what is the diffrence between pressure safety valve & pressure relief valve....pls
How many interlocks at turbine? Plz explain briefly
How to change dcs card in online. (Dsc is maxdna)
the 3 most common transmitter protocol being in refinery or qatar gas and aramco.
Name different parts of a pressure gauge.
while am calibrating Drager polytron 2IR flame gas detector occured non zero status.how can i get zero status?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
How to Calibrate Level Troll in field
what is the protection system in solar turbine compressor