my name is vishal patel.i am from surat.i am instrument technician.
I have 10 years experience in instrumentation field.i have good
knoledge in calibration,troubleshooting and maintanance of
various types of SMARTand NONE SMART instruments.and i have
very good knoledge of loop checking and commissioning.i had
just complate
project of poly ethylene and normal alpha ollefines plant in
Qchem II qatar with tecnimont itly.also i had worked in saudi
arebia,bahrain,abudhabi.
In india i had worked in reliance,essar,ongc and gujarat electric
board.
I am familier with dcs plc and foundation fieldbus systems
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Identification of control valve parts.
Draw a group of instruments interlocked to a Pump & Motor?
why use 50% lel methane gas concentration for gas detector calibration instead of 60% lel gas concentration whereas the hi alarm set at 60% lel.
Difference between 2-Valve Manifolds, 3-Valve Manifolds and 5-Valve Manifolds 3 with diagram
in natural gas indirect water bath heater,how to prevent the problem of backfire from firetube during ignition...becoz of this backfire performance of wbh is going low.
Draw symbols of the following :
when placing a vent or drain hole on an orifice plate should you measure from the center of the bore up or down for the vent placement?
we are using centum vp as monitoring with Dell precision work station T3600 but some times PC(s) are restarted automatically . how we can solve this problem? thanks
How is automatic reference junction compensation carried out in temperature recorders?
Operational amplifiers
We are using Rosemount 5400 series Radar Level Transmitters in all types of Sump Applications having oily water hdrocarbon petrochemical nature. What we are facing the problem frequently is that always getting reading frezzed at some value. If we do power recycling , sometimes it is working . then making same freezing problem. If anybody faced before such type of problem and also having solution , Please give the answer.
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
How signals can be taken through modbus?
in which principle pressure tx,level tx ,flow tx,temp tx ,control valve works?
Why we are using DPT(Differential Pressure Transmitter) in separator instead of level trasmitter?