hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.
Thanks
sunitha
Answer Posted / vijaya
Hi
U can run the job1 then job3 by two methods by using trigger
conditional or by nested condition activity.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the difference between odbc and drs stage?
In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?
What are datastage sequences?
What is active and passive stage?
Define Data Stage?
What are the steps required to kill the job in Datastage?
How many types of hash files are there?
Can we use target hash file as a lookup ?
explain about citrix scheduling tool in datastage
i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu
Difference between server jobs & parallel jobs?
Define Job control?
why do u need the IOS upgradation in a FC switch
What is the importance of the exception activity in datastage?
There are two file are there .1st file contains 5 records and 2nd file contain 10 records in target they want 50 records.how can achieve this