hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.
Thanks
sunitha
Answer Posted / vijaya
Hi
U can run the job1 then job3 by two methods by using trigger
conditional or by nested condition activity.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are the job parameters?
how can we validate the flat files using the date in the header and number of records in the flat file? Using both conditions at a time.
If you want to use a same piece of code in different jobs, how will you achieve this?
What are the main features of datastage?
What is aggtorec restructure operator?
Describe routines in datastage? Enlist various types of routines.
What are the some differences between 7.x and 8.x version of datastage?
How many types of stage?
What are the different kinds of views available in a datastage director?
What is the different type of jobs in datastage?
sed,awk,head
What is the purpose of pivot stage and types of containers in datastage
file having these input and we have to get 3 output using same job Input 1 1 1 2 3 4 4 4 o/p1 o/p2 o/p3 1 1 2 2 1 3 3 1 4 4 4
Explain ibm infosphere information server and highlight its main features?
WAT TYPE OF PL/SQL QUERRYS USED IN DATASTAGE