Answer Posted / ganesh r.k
Technical specification
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
I have got an interview for a higher apprenticeship at JCB next week, the interview process consists of group and solo tasks, and group and solo interviews. Has anyone got any information in what I should expect on the day, or the frequently asked questions so I can get a head start.
Which two groups of management manages the control organization and what are their responsibilities?
What is load line in control valve?
What is the major difference between Normal control loop and Cascade control loop and when to use cascade control loop?
HOW TO EVALUATE THE ACCURACY ADJUSTMENT pressure switches, given a point in switching operations or on the extent Pressure Switch
What is a profit sharing plan?
what are the different ripple removing circuit . which one is better and why
how do you adjust pump impeller clearance?
Why the thermocouple is a transducer an rtd is not a transducer both taking heat as a input and give millivilt and ohms.
what is a benifit to configure site to site vpn ?
whats te normal transformer current rating
Why normally we don’t use relay for digital input module?
Let’s say we live in a country that gets very cold, in Northern America / Europe. In winter, we monitor the ouside temperature, so that heaters can be switched on, inside the house. The idea is that, the colder it is outside, the warmer it should be inside. The heating side of things is just a heater that is either switched on, or switched off. Just from the information that has been given, please discuss this matter in depth. Provide reference to OPEN / CLOSED loop control, FEEDFORWARD / FEEDBACK control and MODULATING / ON_OFF control raised in the discussion.
what is the standard time in production management ?
how can LED bulb indication work correctly without CT OR PT for 3 phase indication if one is cut then it will show the correct indication?