How do you track the technical activities in your project?
How is the status of the project communicated to the team?

Answer Posted / sathya

Technical activities progress tracked from the input received from the team members and inspections.
The status shall be communicated to team members as per devised communication plan, which deals about what type of details required, When required, at what format it required. This plan needs to be finalized during project planning stage.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Tell about current project ?

2213


Did you used crystal reports? Do you have sufficient knowledge on crystal reports?

2154


funds flows analysis how to prepare for interview

1043


How are the team members kept informed about the current status of the project?

2173


How do you rate yourself in c#,vb.net,Asp.net,oracle,sql server ?

4970






Explain the various activities you do (as a PL) when the project is started up.

2366


Why do you want to work for Microsoft?

2712


how to tell project details in interview the project is funds flow analysis?

1167


Write the instr function.

741


How do you ensure that your project plan is available for others to see? Where will you find the plans of other projects executed (in the past or currently) in the center?

2036


Explain dll hell?

667


Given a MAKEFILE (yeah a makefile), design the data structure that a parser would create and then write code that iterates over that data structure executing commands if needed.

5167


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

6481


How do you create the Software Project Management Plan (SPMP)?

4040


What is the project management structure in your project? Is a PL assigned to the project?

2035