what is the size of 50 kg cement bag ? gunny & paper
Answer Posted / avinash gawale
its 2'0"X 3'0" & very simple go on site & take size
physically.
Is This Answer Correct ? | 13 Yes | 9 No |
Post New Answer View All Answers
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
Please tell me vasthu room sizes. Thanks.
Which brick is best for construction ,either fly ash or AAC BLOCKS
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
how is the reinforcement is distributed in triangular slab
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is the difference between chamfer and fillet?
please briefly explain calculating or estimating steel quantity for a RCC column?
How to find CN by using arcgis 9.3?
what is castigliano theaorem
how much required strength of cement concrete bricks(size 230x115x75mm)
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2