what is the size of 50 kg cement bag ? gunny & paper
Answer Posted / avinash gawale
its 2'0"X 3'0" & very simple go on site & take size
physically.
| Is This Answer Correct ? | 13 Yes | 9 No |
Post New Answer View All Answers
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
Which prize is the alternative to the NOVEL Prize?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
indian standard split spoon sampler
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
how many kg of 20mm, 10mm, dust available in one ton stone boulder
what do you know that m20,m25
What is M40 _ TOR - EQ and B.F.S
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
What are the different types of civil engineering?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Volume of 25kg putty bag & 40 kg putty bag volume??