how much quantity of cement(bags)concrete(20mm)and
sand(sqft)is used in 1:3:6 PCC
Answer Posted / renupandey
cement-4.38 bag
sand-0.48cum.
c.a.-0.96cim.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
what is Brest Wall?
Define absolute co-ordinates?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
How many feet are in 4 square yards?
How to get MEP technical,instaaltion & testing data for interview?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
Why nautical mile is different from statute mile?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
What is the Null Point of chimney in Power Plant
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
How is make concrete cube?
Forces in a Shear Wall are in plane or out of plane ?
What is the basic difference between OPC
in plate load test what is the thickness of plate 20mm 5mm 50mm none