What is the unit weight if concrete?.
Answer Posted / no need
P.C.C-2400kg/m^3
R.C.C-2500kg/m^3
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
What is the tensile strength of marble?
What are the common ways of demolition?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
how water proof chemicals act in concrete to avoid leek?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
Calculation of curtain wall of box culvert
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
What is the difference between shear and tensile strength?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
What are the different types of foundation?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
what is the effect of duration of earth quake on framed structures ?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?