Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

in 33KV or 66KV system which connection is aviable on high
voltage transformer primary delta or star ?

Answer Posted / amit

the question is incomplete it should mention weather it is
load end or at generating end.
at generation end primary will be delta and to nullify
generator harmonic and secondary should be star for
transmisssion line protection as it requires distance
protection.
In load end primary is star and secondary may vary
depending on load condition as load may be 3phase balance
or 3 phase unbalanced load,wether neutral is required or
not.

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

mostly the questions were from machines... d.c. machines, transformer, synchronous and induction all theory paper........ few from power system... but the level of paper was easy.....

2021


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1839


what is the transmission loss for electrical supply? specifically a large shopping complex where the grid is half KM away, what will the % of transmission loss? is there any transmission loss for captive unit generation for above set? thanks

2032


why swityard is necessrry requirement in any bis power distributin systems?

2432


How dia computation perfomed in cold rolling mills .

3110


What is formula calculation size cable wire ?

1992


What is the permissable nutral current of three phase system as per IS standards?

2167


we have 3.5MVA-11/6KV transformer. how can we calculate earth fault current and NGR calculation?

1582


How a band pass filter is constructed?

1103


what is the difference between surge protection capacitor and surge arrestor

2372


Pls mail me utility & Dg related question with answer

1835


1.What will be stored in online ups EPROM IC?

2096


HOW TO CALLICULATE RESITENCE,REACTANCE AND IMPEDENCE VOLTGE OF TRANSFORMER 13.33 KVA 144/240 VOLTS 93/56 A WITH FORMULA

2027


How many Zones can be in Conventional type fire alarm system & how can we detect the fire in Conv. type FAS?

1873


How u can give the overload setting to any motor protection relay for a HT motors with formula and Example?

2234