Answer Posted / jalandar
RCC Dam.
Earthen Dam.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
What is the difference between undo & redo?
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
What is command line?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
for pretensioning which will yield first and same for post tensioning?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
2. What are the advantages of your present job, things you like about it?
What are the different approaches in designing the floors of the service reservoirs?
Prepare a Schedule for a Highrised building from starting stage to Handover?
where i can get material costs on weekly basis
What is structural frames or systems?