what is the difference between Feedback controller and Feed
forward controller. and when it is to be used.
Answer Posted / muslim
feedback controller: to monitor the controlled variables
(pressure, temperature,..) and feedback the measured value
to the controller to be compared with set point within the
controller , and finally to give corrective signal used to
stabilize the control loop.
feedforward controller: to monitor all loads that influence
the process.
theoritically we have to monitor all loads, but practically
it's impossible .. as there's unmeasured disturbances (like
pipe fitting leaks, composition change ,..) that can't be
predicted.
so if we are to make a complete feedforward control so we
have no feedback mechanism and so we will have a non
disturbed process, which is impracticale.
practically we have feedforward in conjunction with
feedback control , which enhance the loop stability.
| Is This Answer Correct ? | 15 Yes | 3 No |
Post New Answer View All Answers
Why do we have earthing cable in branch cable and shield in the same cable?
Emergency Shutdown Systems/ Plant Shutdown System.
what are the use of belew gear in general ??
In a gas over oil actuator, after the opening/closing of valve, how the gas is vented out? How does the hydraulic/gas circuit function?
what is commisioning procedure,2)what is is the main work in commisioning in the field tx to dcs, plz send me detail
How RAL(Rotary air lock)works in cement industry?
how will you segregate the alarm levels in alarm management system during factory Acceptance Test
how can i calibrate the temperatuture gauge used by temperature bath(dry block) i mean step by step procedure?
Tell about your IFFCO plant visit.
full process of gas turbin?
key exchanges in wpa,wpa2,tls
What is three element drum level control system why its better than single element?
With N nodes and B branches what will have a network ???
Hi,can anyone help me out with PhD programs related to Instrumentation field?I have a degree in electronic Instrumentation?
can we create an interrupt in plc through scada?