how much quantity of tile placing can be finished by one mason
per day?
Answer Posted / yaswanth kumar
160 to 180 Sft/mason/day
| Is This Answer Correct ? | 42 Yes | 15 No |
Post New Answer View All Answers
How many Sft of Level Plaster per Kg
what is grade intersection?
though u r a civil engineer, y r u interested in tcs???
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What things architect have to take care of before starting any project?
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
Explain what is the release of lien?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What is the difference between Grade I, II and III of GSB?