how much quantity of tile placing can be finished by one mason
per day?
Answer Posted / yaswanth kumar
160 to 180 Sft/mason/day
Is This Answer Correct ? | 40 Yes | 15 No |
Post New Answer View All Answers
Define the various stages of the project planning process in construction.
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
detailed calculation of the amount of cement used?
how to caliculate required amount of cement and sand required for 1cu.m.
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
List out the types of roofs?
how much cement and sand required for 100sqm of wall plastering in different proportions
How to do base isolation for RC framed structure using ETABS software?
how calucate cement sand ratio for plstering
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
How to calculate brick work quantity?? Block work quantity??
what is the criteria for the finalisation of pavement thickness in road project?
how to control PQI (Project Quality Index)
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY