Answer Posted / yaswanth kumar
Lapping work means its an extension of steel bar to high or
in length by providing bend to the jointing bar and firmly
tieup with the previous bars.
Minimum overlapping length is 50 times of the dia of the
Bar
| Is This Answer Correct ? | 22 Yes | 0 No |
Post New Answer View All Answers
What is gravity flow?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
What are the methods of measurement? Describe it shortly
What is the crank length in the slab?
how many spacers we need for 1 ton reinforcement? aprox.
What is the use of extruded feature in solidsworks?
wat would be the probable interview questions and GD topics for IOCL exam?
how to calculate rate analysys of 1:6 plastering 10 sq m
What Reinforcements Are Used In The Process Of Prestressing?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
How you can use different dimension tools in cad? What are the different dimensions available?
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
What will you do if a portion of load bearing wall collapses under your supervision?