What is difference between PLC and SCADA
Answer Posted / raghavendran prabhu lnt
PLC and SCADA are used in the automation field which is a
booming field now adays
PLC-Programmable Logic Controller
SCADA-Supervisory Control and Data Acquisition.
PLC is very good Programmable storage device which performs
more than few operations in a ckt using timers & counters
SCADA is the process which is used as a monitoring&
controlling device from a single place.
| Is This Answer Correct ? | 61 Yes | 15 No |
Post New Answer View All Answers
What is effect of over voltage and under voltage on ACB
What is the current carrying capacity of 35sq.mm flexible cable?
What do you mean by per capita requirement of electrical energy in india
The Q-facr o of a coil given as wL/R. what will be shape of Q versus frequency graph.
Brief working principle of stabilizer,application & safety precautions
What is the difference between diode and a transistor in terms of the direction of current flow?
can we synchronize star system generators with delta system generators?
How does a television work?
what is the use of current transformer in power transformer secondary side.?its connectyed in WTI
Explain using drawings what is reverse PID action w.r.t PID controllers.
1.what is the difference between ct and cvt? 2.what is the difference between pt and cvt? 3.what is the difference between relays and circuit breakers?
i want to know d working mechanism of tafe tractors next i like to know d engine type of apache bighs can anyone help me
why occ characteristics curve in not tracing back when we are bringing back the rhoestat?
block diagram of 2 ups system connected in parallel mode?
Transmission voltage is kept 11KV,33KV,66KV,132KV,220KV due to form factor. What happen to 400KV and 765KV transmission voltage?