Answer Posted / ysr
generally beetween 0.4 to 0.7
| Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
In which code the the maximum height of concrete casting has been explained
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
The concrete slump recommended for beams and slabs; is?
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
how much quantity of cement,sand and water required for 1 sq feet flooring work .
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
How to calculate laplength for 3 floors
Concrete cover for slab, column, beam and footing?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available