Answer Posted / gowri
A pier is a raised walkway over water, supported by widely
spread piles or pillars
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
What are the different types of civil engineering?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
how to calculate the scour depth
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
Exterior Joints,define
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Discuss some applications of modular elasticity?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How to estabilish reinforcement Steel rolling margin for a building projects ?
Define block?