Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

in thermal power plant the steam produced is made to cool
after falling on the turbine blades.
my question is why this is done while the same is needed to
heat up again.
"jab pani ko wapis garam hi karna hai to thanda kyu karte
hai"

Answer Posted / priya

because the super heated steam will be saturated. hence we
cool and then recycle it

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

wat system call?

1961


What the difference between three phase contactor (coil 110vac) & three phase SSR (control voltage 110Vac)? May I use contactor in place of SSR?

2161


I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com

1800


How many size of cable required for a 300m long and 30kw inductive lode

1304


WHY BREAKER ARE USED IN SUBSTATIONS?

2228


what are the advantage and dis-advantage of 3 phase 4 wire energy meter?

2188


I have two PLC processors. I want to communicate both processor with each other. How i can do so?

2153


As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?

1760


plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?

2299


WHAT IS THE SIGNIFICANCE OF VECTOR GROUPS IN TRANSFORMER? WHAT WILL BE EFFECT WHEN PHASE DISPLACEMENT CHANGES IN TRANSFORMER?WHAT IS THE NEED TO BE PHASE SHIFT CHANGE BETWEEN THE PRIMARY AND SECONDARY WINDING

1782


Is it acceptable of installing an earth pit in planters area where bare copper cable, earth rod and connection are susceptible to corrosion due to water?

1945


electrical

2291


WE ARE PLACE A NEW 75 KW MOTOR FOR JPF.IT IS CONNECTED IN M.C.C. WHEN WE ARE STARTING M.C.C.INCOMER IS TRIPPED.THEN WE ARE CONNECTED IN P.C.C WITH A MM30 RELAY PROTECTION THEN WE ARE STARTED MOTOR WILL RUN SMOOTHLY.

2062


why we setting 95 deg and 105 deg in wti and oti of distibution transformer ? give the reson for that ?

3141


I want formula to calculate current loss with distance in km.I searched many sites but didn't right answer.Plz reply me

2052