How to calculate cement required for m20,m5 grade
Answer Posted / nimmakayala
for M5 it is 2.5 to 2.6bags/Cum
the proportion is based on volume ie (1:5:10)
for M20 cement required is 8.01 bags/Cum approximate (as it
Design Mix it differ)
| Is This Answer Correct ? | 46 Yes | 20 No |
Post New Answer View All Answers
Specific gravity of cement?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
what is m30 in concrete tiles
what is civil enginnering & what you need of this course?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
How many lbs are there in a yard?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
What are advancements in civil engineering?
what is the maximum number of course that can be laid according to IS code and the max height.
For a washout valve why are two gate valves required in normal practice?
what are the types of design? which type of method is used at what type of design & why?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
how much cement and sand required for 100sqm of wall plastering in different proportions