How loading get increased in generator not the speed, while
we increasing steam to turbine.
Answer Posted / k.prakashchandra
When the gen is connected to grid ,speed is decided by the
grid frequency.When you increase steam ,the power input to
prime mover is increased and this will be evacuated by grid
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Difference between earthing & grounding.?
What OPGW is better than Microwave or PLCC???
WHAT R THE SAFETIES IN A HIGH TENSION PANEL N LOW TENSION PANEL. ALSO WAT SAFETIES R THERE IN A 200 KVA TRANSFORMER?
is all the servo motors having brake?please specify which servo motors having brake for stop on position and which are not.
what is the disadvantages of common earthing for AC and DC equipment? (i am talking about inverter control room and inverter duty transformer earthing is common...?)
what is magnetizing current test in power transformer
what is the minimum winding resistance of 30hp compressor, to run or to switch on
whate is the meaning of balance/unbalance,in stabilizers type
what is the purpose of bypass mode in energy lighting transformer?
What is difference between Over Current & Earth Fault protection?
Why space heater is required for each verical bus bar chamber? if one space heater is adequate or not for anti condensation?
The power factor of the fixed load is 0.8, now the p.f is varying from 0.8 to 0.5.
5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch
BSNL TTA EXAM QUESTION
What is a fuse? How does it work? What are materials used?