Answer Posted / jaywant joshi
INSTRUMENTATION BY: DAUGLAS CONSIDINE.
PROCESS INSTRUMENTATION; ANDREW JONES
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the process for double acting cylinder pneumatic for 32' v/v
What happen if I install my pressure transmitter below the elevation of pipe in natural gas service?
What is shielding effect?
What is Alpha & Beta fctors related to Orifice Plate & its relation with flow?
With N nodes and B branches what will have a network ???
Explain about the leakage class of the control valves
What are primary elements of measuring pressure?
Hi i am aneesh, done btech in applied electronics & instrumentatiin. And then i took mba in finance & marketing.After that i got placement in finance co and worked there for 3.5 yrs.Now i wanted to come back to engineering job.But without engg experience, i may not able to find an opening.i have done a course related to flow meters and ite calibrations. Kindly suggest where should i try to get a job?
Question on maha cement
Pressure tx shows 1 mbar but we need 1000 mbar at this process condition .. how can we sort it out .
Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =
what is performance test.need defination
how is work pressure switch& level switch?what is the principle of this?
what is the procedure to callibrate temp controller ,pressure controller,etc. suppose a temp controller showing error 1.5 degree centigrate how can i minimize it.
any body who gone thru recent iocl interview.INSTRUMENTATION questions. I need.