Can there be a line which can cut all the four quadrants?
Answer Posted / guest
one line can not cut 4 quadrants
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Total balls z,red balls N remaining are blak balls,then %of black balls equal to
If it takes 10 technicians working 6 hours to build a server. They start woring at 11 AM and 1 technician is added per hour starting at 5 PM. At what time they will finish the server?
If A/B = 3/5,then 15A = ?
Some statements are given below: � L says all of my other four friends have money � M says that P said that exactly one among them has money � N says that L said that precisely two among them have money � O says that M said that three of the others have money � P, L and N said that they have money All the above statement are false.. Who has money & who doesn't have any money?
The sum of the digits of a two digit number is 8.When 18 is added to the number, the digits are reversed. Find the number?
i need icet solved papers 2000 to 20010,and also mock papers,mock online
There is square of side 6 cm .A circle is inscribed inside the square Find the ratio of area of circle to the squqre .
In a mixture, R is 2 parts and S is 1 part. In order to make S to 25% of the mixture, how much of R is to added?
A Farmer owns a square land of 15 m each side with a pole in one of the corners to which he tied his cow with a rope whose length is about 10 m. What is the area available for the cow to graze. (Assume pi = 3)
A gardener plants 100 meters towards east, next 100 meters towards north,next 100 meters towards west. 98 meters towards east, 96 meters towards north and 96 meters towards west, 94 meters towards south. and 94 meters towards east and so on. If a person walks between the trees what is the total distance travelled by him before he reaches the center.
How many mod 3 counters are required to construct mod 9 counter.
What is the selling price of can cost selling price of .. cost .. is Rs 60 ,10% profit over selling price ?
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
Name of the cipla medicine product
some people went for vaction. unfortunately it rained for 13 days when they were there. but whenever it rained in the morning, they had clean afternood and vice versa. In all they enjoyed 11 morning and 12 afternoons. how many days did they stay there totally