Can anybody help me by attaching files , formats for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates?
Regards,
Answer Posted / deepak raj
Dear Chatterjee sir,
kindly send mail me by attaching that details files for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates
My Id is pdraj03@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
How much quantity of cement,sand,stone used to build 1 cum of cc road??
cement and sand required for one block of size 0.23*0.15*0.46
can you give me the details of rate analysis of steel and concrete?
What are the important hardware systems used for cad?
What is the name of this multiplication factors ?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
I have an span length 16 ft c/c
how much tempareture are required to make liquid state of pid leed
what is the calculation of raw material for 0.35cum of m-15
Scaffolding IS code NO.
Write short note on construction programme for pile foundation.
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?