Answer Posted / ramanathan
SATISFACTION REQUIRED OUR MIND, THEN WE WILL HAPPY FOR
SALARY
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
How much material will consume for following specification water tank (9*7.5*6 feet)?
how to do cementicious paint for rcc walls of cw pump house
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
Spider cracks occur in beam bottom due to––
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
Define What is the meaning of a blue land surveyors flag?
Why should you consider yourself fit to be hired by jindal steel.
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
define the strength
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
Explain the Strength of brick?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
Explain moment of inertia and its importance.
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.