how to write the program for single push button by using
ladder diagram
Answer Posted / praveen kumar m
PB k1
|---II--|--------------( )--|
| k1 | |
|---II--| |
| |
| PB k1 k2 |
|---II--|----II--------( )--|
| k2 | |
|---II--| |
| k1 k2 Y1 |
|---II-------I/I-------( )--|
PB= push button
K1 n K2= Contact switches n relay coils
Y1= motor(to switch on r off)
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .
why direct mounted pressure transmitters is always installed with DBB ( double bleed block) valve in process line or top of the tanks ?
What is profibus?
How to calculate P,I&D value in PID controller ?
what is a vortex flow meter,mass flow meter and electromagnetic flow meter.particular use of this.means in which condition particular meter is used.
diff between neutral ,ground,phase , earthing and shielding?
what is diffrance between FF & SMART, explain with difination
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
How to calibrate smoke Dectector
Sir, I am working as a Instrument Engineer in Grasim Industries. Can any body provide question answer for interview purpose
how can leve transmetter calibate in feild .and also put cv and flow plz .....
sir, i preparing hpcl,ongc,barc,hal exams(instrumentation engg)pls send a placement papers
I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.
Why use ball valves on Gas pipelines instead of gate & or globe valves...means basic diffrence or use of these valves..how designers knows this type of valve with rating is required...
How can you add value to this Industry if offered the job?