what is the relation between the size of the machine and
the frequency? (when the frequency increases the size of
machine will increase,why?)
Answer Posted / shiju
for higher frequency in generator need more poles so the size of the machine will increase.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
WHAT HAPPENED DC SERIES MOTOR FIELD WINDING OPEN. CAN POSSIBLE.
sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan
What is the drawback of class b amplifier? How is this minimized?
What are the types of windings present in the ceiling fan? What winding will be effective first when we started the fan?What are the resistance and inductance ratios comparatively at the initial speed and full speed of the fan?
IF I KNOW THE AREA OF CROSS SECTION OFTHE WIRE , WATTAGE OF THE LOAD ,VOLTAGE SUPPLY WHAT IM GIVING TO THE LOAD AND ALSO POWER FACTOR OF LOAD ....... SO GIVE ME FOR WHAT AMOUNT OF CURRENT I SHOULD USE WHICH TYPE OF CABLE?
Can u tell me design of switch yard
What is the effect on power factor, shown by a trivector meter; incase of reverse phase sequence. If the power factor of a system is lag what meter will show in case of reverse phase sequence connected to the meter. and What in case of lead.
How to know vacuum in vacuum cylinder of breaker in working condition
please send me jindal previous aptitude and technical question and answer.my email id is deep_raj@live.com
if 6 earth pit value is 1.5 ohm then what should be the number of earth pit to make the value .8 ohm
Is RTCC panel needs any control supply.
How to calculate energy stored in a capacitance
1.what is the difference between transformer differential and busbar differential.2)why we are using 2 slope for trafo diif and 1 slope for busbar diff.3)what is the purpose of metrosil and stabilizing resistor in high impedance relay circuit.4)how metrosil reduce the peak volage.5)what is the funtion of stabilizing resistor
WHY L-G FAULT IS MORE SEVERE IN TERMS OF RRRV?
how can get electrical "c" licence.i am complited in DEEE.PASSING YEAR OF 1993.WORKING IN PVT COCERN LT LINE.PLEASE ADVISE ME .CELL NO 9994786021