Answer Posted / k bu babu
strength of the 1st class brick:105 kg/sq.cm
Water absorption in 24 Hrs.it should not be greater than 20%
of it weight.
| Is This Answer Correct ? | 46 Yes | 3 No |
Post New Answer View All Answers
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Define aligned dimension?
What Reinforcements Are Used In The Process Of Prestressing?
How to calculate steel for beam slab and column
How to increase a bearing capacity of soil?
What is an object snap mode?
What does civil status mean?
How do we calculate absolute pressure?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What things architect have to take care of before starting any project?
In cement concrete how to check a quality of material also proportion of material at site ?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.