Answer Posted / raisingh gurjar
12lacs/yr
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
What is absolute pressure? How absolute pressure is calculated?
Which is the latest version of solidsworks?
what is total volume of ingredients used in concrete accordingly
what discoveries did you have in relation to your course?
cement and sand required for one block of size 0.23*0.15*0.46
all technical question
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Define What is the origin of name Railway Sleepers?
Which percentage of carpet area use in plot area of office building.
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Concrete cover for slab, column, beam and footing?
Which is the best book for building construction?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Sir how to find cutting length for footing steel bars in the shape of "u"