Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the Gap Should maintain for HT cables crossing of
LT Cable?

Answer Posted / rajiv

the gap should be bear minimum 300mm from both cable trays
and these are not crossed and if required then the angle
should be of 90 degree.

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW TO SELECT THE COPPER CABLE SIZES OF MOTORS,TRANSFORMERS?

2108


A d.c. Shunt motor is found suitable to drive fans because they require?

1298


No load tap changing transformer working

1643


What is the method of estamating of cable, CB,MCB ?

2166


Define ampere

1285


how can i apilly for electrical c licencese.sir,i completed B.Tech in electrical & electronics engineering in 201onot working any company

1914


what is basic difference betmeen normal & flame proof motor??

2016


What is the difference between diode and a transistor in terms of the direction of current flow?

2205


grr resistance & contrator malt continuous

2135


what maximum range of star & delta in hp or kw ?

1683


what's the simultenous maximum demand (SMD)..what the diffrent MD and SMD?

2506


we need a ntpc previous papers

1920


what is the standard values(Megger test) of resistances between L&N,L&E and N&E for a system on IEE regulations?

2255


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1949


Following test should be conducted to find out relative polarity of transformenr terminals A no load test B back to back test C phasing out test D none of above

2212