When we getting shock, its we getting from voltage or
Current.
Answer Posted / sumathi.m.p
Because of high Voltage, current passes on our Body & we
get Shock
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
plz send me the syllabus or any sample paper for engineer trainee recruitment if any,on ravinder911@yahoo.com
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
What is a fuse? How does it work? What are materials used?
. What is Electrical Life & Mechanical Life of Circuit Breaker? 2. What is Electrial Life & Mechanical Life of Magnetic Contactor? 3. What is RCD, RCCB & RCBO? 4. What is the Between defferance of RCD, RCCB & RCBO?
How to run a three phase motor into single phase........
in ACB breaker requireding 3200Amps. buscoupler getting OFF mode and again it reset and getting normal position give me a required answer?
In all analog voltmeters or ammeter showing some small size symbols. as well as a star and in star 2no. digit, resister symbol,and other. what is that's meaning ?
explain the Trip supervision circuit
What will be the output voltage of a transformer if it is primarily energized from a square wave voltage source?
do we use links in a dc circuit?if so what s its use in it?
how can calculate resistance box for 15 kw, 6 pole, RV-230, RA-42 motor
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
how to electronic energy metter failed in electomagnectic fild passing in the metter and which thing to defect more on metter.
How to calculate the input cable rating for 10kva ups (3phase input and single phase output and also 3phase output, battery rating 65Ah)provide the formula also.thnx