Answer Posted / rahul
pile
Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is the crank length in the slab?
Formula for calculating the volume of bulb in underreamed pile
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
what is work of planning deptt. in any construction compny (in road project)
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
what are the ffactors you considered choosing the course?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
What are some structures that may be subjected to fatigue?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
Which tests are performed on soil to decide the type of foundation to be provided.
very simple or less time consuming formula for reinforcement calculation by moment
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)