Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how the vaccum ckt breaker workes..? how the arc is
quenching in it?

Answer Posted / k.prakashchandra

The arc is quickly quenched as the metallic
vapours,electrons and ions produced during arc, rapidly
condense on the surface of the breaker contacts due to
fast rate of recovery of dielectric strength in vacuum.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pls,send the previous year written test questions.

1923


What is the RMS and DFT principle of analogue maesurments. Which way they are advangages. where which princples give optimum results.

2684


why burdens of VTs is more than CTs?

1795


What are unstable systems?

1126


can i use the six sigma method which is used in management area, in state estimation of power systems?

1871


As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?

1774


what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.

2162


what is the formula for hv test for cable and circuit breaker..????

2045


How to derive detailed design of Suitable bus Bar for 100A for 6.6KV?

1809


While testing LA mast,What are the parameter limits ?

1909


Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?

1729


According to conduit size which size wiring & how many wires can we provide wires in conduit & how can we select conduit size accordingly?

1903


What are steps to be taken while designing of DYN11 distribution transformer to achieve magnetising balance?

3545


Is it required to lay 2 runs of GI wires along with armoured cables from one power DB Machines of higher rating?

2050