hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.
Thanks
sunitha
Answer Posted / ranjith reddy
hi
sunitha
by using trigger condition
move job1 to job3
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How will you move hashed file from one location to another location?
How do you generate sequence number in datastage?
What is usage analysis in datastage?
project Steps,hits, Project level HArd things,Solved methods?
options available in sequence job to run,validate?
file having these input and we have to get 3 output using same job Input 1 1 1 2 3 4 4 4 o/p1 o/p2 o/p3 1 1 2 2 1 3 3 1 4 4 4
What are the different kinds of views available in a datastage director?
how to implement scd2 in datastage 7.5 with lookup stage
How to convert RGB Value to Hexadecimal values in datastage?
What is the purpose of interprocessor stage in server jobs?
Difference between server jobs & parallel jobs?
how to achieve this output ? Two Input columns(ID & Name) - ID | Name 1 | Jack 1 | Kara In output there should be only 1 column which will be populated as - 1,Jack 1,Kara
how to connect source to db?generally what r stages u used? how to find the data is having delimiter format?
In Datastage, how you can fix the truncated data error?
How will you load you daily/monthly jobs datas in to Fact and Dimension table using datastage.