Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How do you find the weight of rod per metre lenth ?

Answer Posted / sangavi

d2/162

Is This Answer Correct ?    7 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1806


Define mirror?

1265


what is the price of a cubic meter of concrete on international market?

1209


what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?

1633


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

2104


Does VDF add strength to the flooring apart from preventing water ingress?

1572


What is the tensile strength of marble?

1157


How cracks in concrete can be avoided?

1151


Concrete cover for slab, column, beam and footing?

1086


I want to join bhel because

2181


How to find permissible diagonal tensile stress in reinforced brick work

2520


what does the track parameter mean in staad.pro?

6066


what is the minimum compressive strength of clay brick

2209


What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?

2412


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2261