Answer Posted / althaf rahman
Synchronization point is not belongs to Loadrunner and it's belongs to QTP.
synchronization point is nothing but time interface between
tool and application build.generally we r giving
synchronization point to give waiting time to the tool.
| Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
How to run a scenario?
What the host attributes determine?
What is the difference between transaction and transaction instance in loadrunner ?
What do vuser_init and vuser_end action contain?
What is the advantage of running vuser as a process than a thread?
What is think time?
Hi can anyone help with projects using load runner. I learnt loadrunner but don't have a hands on experience on it.. it will be very much helpful if some can help me up with a project. can email me: priya.joslic@gmail.com
What is the load runner testing process?
what are the skip functions in Load Runner?
What are monitors?
What tools are required to analyze vuser run results?
What is vugen recording and scripting?
During the load test, what is the optimum setting for logs?
How you load a loadrunner agent?
What do you mean by initialization of quota?